Case Study: Hybrid Solar Power Project in Hissar

Posted on Posted in Knowledge Center, User Story

This week we bring to you a Case Study of our client who has recently installed a Hybrid Rooftop Solar Plant. We thought it best to share his experience with our users and so here is a brief. To give you an overview, this is a Residential Rooftop project with battery back-up. The project was executed at the on-set of Summer 2017.

IMG_20170404_182054A picture of the Installation at the client’s site in Hissar

Overview:

The project capacity is 2.5kWp (Get your estimate here).

Components:

  • Modules: Canadian Solar (315 Wp)
  • Inverter: 3kVA, 48V, Solar Hybrid Inverter, Flinn Energy
  • Batteries: 150 Ah Exide Solar Batteries
  • Structure: Raised (2400 mm)
The project is setup in a rural area where electricity supply is not continuous and power outages can be seen for up to 8 Hours a day. Solar Power for our client was a reliable and clean source of energy for energy security. The system is completely automatic, nothing needs to be done to use this solar power. For maintenance only PV Modules cleaning is required roughly every two weeks depending on the local environmental conditions like dust on panels.

 

The project is setup in a rural area where electricity supply is not continuous and power outages can be seen for up to 8 Hours a day. Solar Power for our client was a reliable and clean source of energy for energy security. The system is completely automatic, nothing needs to be done to use this solar power. For maintenance only PV Modules cleaning is required roughly every two weeks depending on the local environmental conditions like dust on panels.

Timeline:

Day 1: Completed the foundations and structure installation.

Day 2: Earthing pits.

Day 3: Batteries, ACDB and Inverter were installed and AC side wiring was completed.

Day 4: Modules, DC distribution box were installed and DC side wiring was done.

The project was commissioned on the fourth day on April 3, 2017.

User Experience:

Was your Solar Power Plant appropriately sized?

From what we have seen in the last two weeks that Solar Energy is sufficient to take care of energy requirements. We haven’t seen the instance where batteries are discharged to a level where power from the grid is required to charge the batteries and meet the load requirements.

What has been your experience so far with solar?

Our experience has been very good. Now we have continuous (24*7) and clean electricity at our home. It’s not only visually appealing but high quality performance system. This has been much better than what I had originally expected.

Would you recommend it to your neighbours?

I would strongly recommend it to my neighbors and friends. We have friends coming to home who enquire about the project and its performance. I hope these kinds of installations will help in educating the people and adoption of Solar Energy will increase in rural areas.

Did Ezysolare make it simple for you by supplying material on time? How long did it take? 

Ezysolare played an exceptional role in the project right from planning to delivery. It not only helped in buying the items instead Ezysolare took it to next level right from calculating the load profile, generating the Solar Energy Assessment Reports, Techno-Commercial comparisons with the help of Ezysolare platform and ensuring timely deliveries of components. And it all just took three weeks to execute the project right from planning.

What did you have to do apart from approving each step?

The entire process the fairly simple and user friendly. I just approved the order, thereafter Ezysolare team took care of everything procurement, dispatch, sharing the tracking details and exact status of material on a daily basis and arranging for a local installer.

Ezysolare’s moto has always been to make ‘going solar’ simple. With the summer’s here, there would be no better time to go solar, reduce your bills and keep you home/building cool. Send us your query here and we shall be prompt in getting back to you.

10 thoughts on “Case Study: Hybrid Solar Power Project in Hissar

  1. I wish to know, have you done net metering also, If not then can u call it a Hybrid system? or it should be called as an Off-Grid system only. plz clarify

      1. 1. Is the Flinn Hybrid Inverter qualified for Grid Connection? In Delhi & Rajasthan the the have not cleared this Inverter.
        2. I’ve not come across the required IEC Certificate for this Inverter.
        Please clarify. We are very keen to use such Inverobters if the qualification can be assured.

        1. Dear Gulshan ji,

          For FlinInfini Lite series, here is the list of certifications:
          IEC 61000-6, 61000-3, 61000-4 [Electromagnetic compatibility]
          IEC 55022 [EMC emissions testing]
          IEC 61727 [Grid Interconnect]
          IEC 62116 [PV – Utiltiy interconnect, Islanding prevention]
          IEC 62109-1, 62109-2 [Safety for PV systems]

          Here is the list of certifications that we have now:
          IEC 61000-6, 61000-3, 61000-4 [Electromagnetic compatibility]
          IEC 55022 [EMC emissions testing]
          IEC 61727 [Grid Interconnect]
          IEC 62116 [PV – Utiltiy interconnect, Islanding prevention]
          IEC 62109-1, 62109-2 [Safety for PV systems]
          IEC 60068-2 (1,2,6,14,27,30,75,78) [Environmental]
          IEC 61683 [Efficiency]

          Hope this clarifies. Do let us know if you have any more questions.

          Regards,
          Tanya

  2. Greetings from Century Solar. …
    Your articles on the opportunity for solar installation to Handloom segment is very useful.
    We are focusing our operations in Tamil Nadu, Kindly let us know, how do we work with your company on the Handloom segment?
    Our Operations -Head Mrs.Latha will be in touch with your company.
    Regards
    D.P.Kumaresan
    9689957543
    9849294538

  3. Project well executed. This was a good lesson to some of us who want to start solar companies in Africa. Working closely with the client is very important and timely delivery project wins the customer’s royalty. Using quality materials with skilled manpower are also important.
    Congs. Job well done

  4. Good article from Ezysolare.

    I wish to know whether plants like this (Hybrid Solar Power Projects) allowed in Tamil Nadu or not. As per Tamil Nadu Electricity Regulatory Commission. TNERC’s order on LT Connectivity – Ner Metering, Grid Interactive with battery backup won’t be encouraged for Installation. Is it right? Please reply us back with the possible information.

    1. Thanks for your comment Vignesh. I don’t think there is anything against installing battery backed systems. Can you provide me with some document that explicitly states that?

      Regards,
      Tanya